Fo Shan Sky Glass Co., Ltd. applies quality control throughout the production of glass processing machinery, covering incoming materials and components, machining, mechanical and electrical assembly, commissioning, and final pre-shipment testing. Every completed machine undergoes an 8–24-hour continuous running and stability test before shipment.

 

 
5-Stage Quality Inspection Workflow
 
01/

Incoming Material & Component Inspection
Every raw material batch and purchased component is inspected before release to the workshop floor:

  • Steel plate thickness, structural beam dimensions, and structural material condition.
  • Hardness, straightness, and dimensional tolerances of drive shafts and linear motion components.
  • Verification of model numbers, ratings, and electrical parameters for motors, sensors, and PLC units.
02/

Machining & Dimensional Tolerance Inspection
Critical mechanical components and machine bases are checked during fabrication against production drawings:

  • Plano milling flatness checks on main structural machine beds to maintain long-term geometry.
  • Alignment and concentricity verification of bearing seats, spindle mounting bores, and drive interfaces.
  • Precision dimensional checks on CNC-machined and precision-cut components against production drawings.
03/

Mechanical & Electrical Assembly Inspection
Sub-assemblies undergo verification before power-on commissioning:

  • Parallelism and straightness alignment of linear guide rails and ball screws using dial indicators.
  • Fastener torque verification and mechanical drive tensioning.
  • Control cabinet wiring inspection, terminal numbering, phase sequencing, grounding continuity, and safety circuit verification.
04/

8–24 Hour Continuous Machine Running Test
Fully assembled machines are subjected to an 8- to 24-hour continuous running trial under operating speeds to check stability:

  • Thermal Monitoring: Bearing block temperatures and drive motor heat dissipation under continuous load.
  • Mechanical Stability: Spindle runout, dynamic vibration assessment, and drive noise checks.
  • Fluid & Air Sealing: Sealing integrity checks on water circulation pumps, spray nozzles, and pneumatic lines.
  • Safety Systems: Sensor response timing, PLC safety interlocks, and physical emergency stop function verification.
05/

Final Pre-Shipment Check & Export Packing
Final verification ensures the equipment matches purchase order specifications and destination shipping standards:

  • Machine surface finish, paint coverage, and protective sheet metal covers.
  • Complete inventory check of ordered machine accessories, spare parts, and tooling.
  • Seaworthy packaging inspection, including moisture-proof wrapping and steel-reinforced wooden crate securing.

 

Component Standards
 

Critical control, electrical, bearing, and structural components are specified according to machine configuration and project requirements.

Component Category

Standard Supplier / Material

Quality & Inspection Focus

PLC & Control System

Siemens

Program verification, HMI response, operating logic, and wiring integrity

Electrical Components

Schneider Electric

Component specification, circuit protection, relays, and contactor functions

Bearings & Linear Guides

NSK

Model verification, alignment, spindle runout, and smooth running condition

Structural Steel

Carbon / Alloy Steel

Material thickness, weld quality, frame alignment, and structural condition

 

Compliance Documentation & Test Records

Available upon request based on machine model and destination market requirements:

CE-related conformity documentation

01

ISO 9001 quality management system documentation

02

Applicable UL-related documentation

03

Factory Test Reports (FTR) and serial-numbered inspection records

04

Electrical schematics and mechanical maintenance manuals

05

 

Equipment Traceability & Third-Party Inspection
 

Serial Number Traceability

Each machine is assigned a permanent factory serial number. Inspection records, incoming component certificates, electrical diagrams, and pre-shipment test logs are permanently archived in our database. This guarantees fast component identification and accurate matching for future spare parts or maintenance requests.

Third-Party Inspection Coordination

For projects requiring independent quality verification, we coordinate on-site pre-shipment inspections (PSI) and Factory Acceptance Testing (FAT). We accommodate third-party inspection agencies including SGS, TÜV, and Bureau Veritas (BV) based on project scope.